SS 263 Pipeline Abandonment

SS 263 Pipeline Abandonment

EPIC Management Resources, LLC provided project management services from engineering, permitting, contracting and onsite inspection of Contango’s pipeline abandonment project in the SS 263 field offshore Gulf of Mexico. The pipeline was buried in preparation of a planned platform removal.

Gulf of Mexico Satellite Platform

Gulf of Mexico Satellite Platform

EPIC Management Resources, LLC provided Project and Construction Management Services for the design, construction and installation of an unmanned platform and associated pipeline for a South Timbalier block in the Gulf of Mexico. The 6 month project was completed on time, under budget and with zero safety incidents.

 

Noble Energy – Tamar Project

Noble Energy – Tamar Project

EPIC Management Resources, LLC provided the Commissioning Lead and the PTW Coordinator for the Noble Tamar production complex.  The platform is located 50 miles offshore Israel and was installed in 800ft of water.   The platform was fully operational in Q2 of 2013 with a processing capacity of 1.2bcf per day of natural gas.

Wells Operation Support

Wells Operation Support

EPIC Management Resources, LLC provided the Project and Construction Management Supervision of the installation of a snubbing unit.

Eugene Island 11 H Facility Upgrade

Eugene Island 11 H Facility Upgrade

EPIC Management Resources, LLC provided project management services from conception overseeing engineering, regulatory, I&E, construction, procurement, inspection, transportation and commissioning for facility upgrades on Contango’s EI 11 H Complex.  Innovative techniques such as welding habitats were utilized during the offshore hookup to minimize shut in time on this 60 day (50,000 man hour) offshore installation.

Platform Rig and FPSO Projects Offshore Brazil

Platform Rig and FPSO Projects Offshore Brazil

EPIC Management Resources, LLC provided Project Management services for the treatment of 200,000 bbls of water and oil emulsion stored in the multiple storage tanks on the FPSO and to convert external ballast tanks back to oil storage tanks.  EPIC also provided Project Management services for the reinstatement and  system verification of the existing drill rig located on the platform interconnected to the FPSO. The platform and FPSO are located offshore Brazil in 340ft of water.